OFFICIAL “FOR” COMMENT ON QRR PLAN FROM KERR LAKE PARK WATCH SENT TO CORPS

Kerr Lake Park Watch has sent its comments for the official record to the US Army Corps of Engineers.  “This is a precise and concise document in favor of the QRR (Quasi-Run-of-River) Plan, partly from us and partly from the RRBA,” said Frank Timberlake, Kerr Lake Park Watch spokesman.  “We have a number of people who have copied the short version off of our Facebook page and the public is certainly free to use this example, but it must be sent to the Corps by tomorrow night at 11:59.”

The Corps email address is:  eric.k.gasch@usace.army.mil

Mr. Eric Gasch, QRR Comments
US Army Corps of Engineers

Although we have not been in touch with the entire membership of the 400+ persons of Kerr Lake Park Watch, the majority of those reached concur that we as a group are in support of the Corps’ adoption of the QRR (Quasi-Run-of-River) Plan.  As the Public Affairs Lead, I am requesting that our opinion and comments go into the official comments record.

COMMENT:

The Roanoke River’s flow has been significantly affected by three dams near the Virginia/North Carolina border. Current dam operations hold large amounts of water in place for unnaturally long periods of time during wet years – causing long periods of flooding, damaging timber, wildlife, and fish. In turn, people who live along the river and depend upon it are also hurt. Since 2000, many conservation stakeholders, resource agencies, local property owners, and other conservation partners have worked with the Corps of Engineers (COE) to improve dam operations at Kerr Reservoir, reducing consequences to people and nature. Today the COE is proposing changing its operations.

Our first reasons are of course, based on recreational and tourism motives.  We feel that QRR will provide:

Improved Conditions in Public Parks & Public Areas – Controlling the flow of the Roanoke River through Kerr Lake using the QRR Plan would help prevent as much water as now that gets onto public parks lands.  If water levels did elevate to where it covered public areas, the use of the QRR plan would get that water off faster.

Improved Conditions for Public and Private Roads Near Flood Prone Areas – With the QRR Plan in effect, the COE could move flood waters off of public roadways and private areas much faster which has to be a huge factor towards public safety not to mention erosion and the costs of road, bridge and public area repair.

Improved Timber Stands Scientific research shows that continuing current operations, with long periods of flooding, will lead to loss of valuable hardwood trees such as oak and hickory. Over time, the forest will convert to trees with less value on the timber market such as sweet gum and red maple. Changing dam operations will reduce flood times and allow oaks and other hardwoods to flourish, which is good news for property owners along the river.

More Time on the River and in Forests of the FloodplainCurrent operations, with their high water levels, block access to the floodplain for long periods of time. Changing the dam operations will give anglers, hunters and outdoor enthusiasts more time to enjoy the area. That’s good news for recreational users of the river; it is also good for the many businesses that cater to recreational users.

More Food for WildlifeAs oak trees disappear so do their acorns, which are a major source of food for deer, squirrels and other wildlife.  Changing the dam operations will keep the acorns dropping and ensure continued abundance of wildlife, which is good news for hunters and wildlife enthusiasts.

Improved Water Quality Holding large amounts of water behind dams or in the downstream floodplain for long periods of time leads to lower levels of oxygen in the water. The fish and other animals are hurt, particularly in hot summer months. Changing the dam operations will improve oxygen in the water – reducing fish kills and ensuring that fish thrive in the Roanoke, which is good news for anglers.

Reducing ErosionLong periods of flooding lead to banks eroding and collapsing. Changing dam operations will reduce shoreline erosion on the river and in the Reservoir, which is good news for property owners.

Increasing Flood StorageCurrent operations result in sustained high reservoir levels, reducing capacity for storage of additional storm events.

Again, please see that my supportive email for the passage of the QRR plan is included in the record and counted as a very loud, “FOR!”

Thank you and best wishes,

Frank Timberlake
Lead, Public Affairs
KERR LAKE PARK WATCH